Skip to content

Turnkey Mills · Pakistan

Flour Mill Project Cost in Pakistan — and How We Build the Whole Mill

Most suppliers sell you machines and leave. We have built seven mills from bare plot to first bag of flour — one contract, one responsible party, for 40 years.

Row of SH-RM40 roller flour mills installed in a mill hall with overhead spouting

Cost

Quoted per site — roller bodies from PKR 10 lac, plansifter from 18 lac, washer from 25 lac

Capacity

Lines from an 8-body, 6 t/h section upward

Timeline

Fabrication from 10 days; full mill timeline set at contract with milestones

Pakistan only. We build turnkey mills inside Pakistan. For buyers abroad, we export machinery and provide consultancy — see the Export page.

Scope

What building the whole mill means

We have built seven mills from bare plot to first bag of flour: architecture and building design, civil construction, machinery manufacture and installation, electrical and solar systems, staff training, flour testing and production start-up. One contract, one responsible party.

That is 40 years · 7 mills built from the ground up — Burhan (Gujrat), Feroz (Taxila), Sadiq (Sialkot), Gharibsons and Paramount (Karachi), Wahab and Al Harmain (Sundar, Lahore). Their owners are our references.

Budgeting

What a flour mill project costs in Pakistan

No honest engineer gives one number without knowing your capacity, land and building status. What we can give you is the structure of the cost, so you can budget:

  1. 1

    Land & civil works

    Your largest site-dependent variable.

  2. 2

    Milling machinery

    Roller mill bodies from PKR 10 lac each (from 16 lac with Pakistani rolls, from 25 lac with imported); plansifter from 18 lac; cleaning section quoted as a package.

  3. 3

    Motors & electricals

    Motors are separate (10/15/20/30 HP per roller body, fitted on request); panels, cabling, transformer.

  4. 4

    Power connection

    See the table below; B3 connections take time — apply early.

  5. 5

    Solar (optional)

    Cuts your biggest running cost; we design and install it as part of the project.

  6. 6

    Working capital

    Wheat stock, wages, first months of operation.

WhatsApp your target TPD and whether you have land. We reply with a written, itemized estimate. Turnkey projects are quoted only — no two sites cost the same, and anyone who publishes one flat number is hiding something in it.

Power planning

kW load and B2 / B3 connection guidance

Mill scale (24-h basis)Approx. connected loadWAPDA/DISCO connection
~100 TPD~400 kWB2 (up to 500 kW, 400 V)
~160 TPD~630 kWB3 (above 500 kW, 11 kV)
~250 TPD~1000 kWB3, 11 kV, dedicated transformer

Planning figures — final load list is produced at design stage. Per roller body, motors run 10–30 HP (7.5–22 kW). The B3 application, transformer and metering can take longer than the building: we start the paperwork with you at contract signing, not after.

Solar option: we have installed solar on client mills to offset daytime grinding load. Ask for it in your estimate.

The process

How a turnkey project runs

  1. 01

    Consultation (free, WhatsApp/call)

    Capacity, budget, site, timeline — 5 questions, straight answers.

  2. 02

    Design

    Flow sheet, machine list, building drawings, load list, cost estimate.

  3. 03

    Contract

    Scope, milestones, payment schedule in writing. 50% advance at order · 50% before dispatch (ex-works Gujrat) for machinery; civil and installation billed by milestone.

  4. 04

    Build

    Civil works run while machines are fabricated — fabrication from 10 days.

  5. 05

    Install & commission

    Machinery erection, electricals, aspiration, trial runs.

  6. 06

    Training & first flour

    Your staff trained on the running mill. We leave when flour is in the bag and the numbers are right: up to 78–80% extraction achieved at client mills on Punjab wheat.

Straight talk

Is a flour mill a good business in Pakistan?

Flour is a staple with year-round demand, but margins are made in the engineering: extraction percentage, power cost per bag, and uptime. A mill drawing 80% extraction instead of 74% earns the difference on every single bag, forever. That is why the machinery and the flow sheet matter more than the marble in the office. We have watched seven mills operate across 20+ years — bring your numbers and we will tell you honestly whether they work.

After handover

We don't disappear

  • 12-month warranty — parts & on-site servicing, all machines.
  • Spares and roll re-fluting service for the life of the mill.
  • Follow-up visits by arrangement.

We speak English · اردو. Reply within 1 hour. Prices reviewed monthly.

WhatsApp